Structural Engineers Division

We are South London's largest structural steel fabricator with the capacity to undertake even the most complex steel frames. Our clients range from property developers to PFI partnership schemes.

We have built up a solid portfolio of clients based on our competitive rates, performance level and the ability to work with our customers. Ensuring that from start date to completion any alterations and design changes are dealt with without disruption to completion dates.

The continued expansion of the company is based on our customers support and we aim to continue maintaining and improving our service to meet the high standards our clients demand.

 
Case Studies
 

Rainham Medical Centre
A steel form structure of 140 tonnes erected over RC ground beams on a former brown field site. The floor system was fast track metal decking used on the three upper floors. Erected with a tower crane with the buildings foot print covering 80% of the site.

click image to enlarge.
 

Ellesmere Nursing Home
This building has around 120 tonnes of steel with some lightweight steelwork over RCX pre-cast slab floors at the rear with metal decking at the front half of the building on 4 floors plus plant room. Tight fabrication and erection tolerances helped keep wall thicknesses down even with extensive pretensions and bracing fitted within the wall cavities. Line and level tolerance was +/- 5mm end to end distances.

145 tonnes. Fast track metal decking on 3 floors plus a hidden plant room within the roof space. The design asked for half of the upper floor roof steel to be left as a visible feature showing an intricate metallic faceted roof detail with clean lines.

click image to enlarge.

Nunhead Green
Contract Value £340,000
A substantial steel framed building of 186 tonnes of structural steelwork covering the sites footprint.

The building was over three floors and featured a curved façade on one elevation. The structure was erected over R.C ground beams using a mobile crane operating from within a partial road closure. The pre-cast flooring slabs were laid in a planned sequence with the steelwork which allowed other trades access to progress there works with minimal delays.

click image to enlarge.