One Tower Bridge, London, SE1

Steel roof frames, to 9no new concrete accommodation blocks.

The roof frame steelwork was supplied and erected onto new concrete structures. This was a very prestigious project, built between Tower Bridge and City Hall, with direct views across the Thames to The Tower of London. Prior to the steel frames being erected we supplied plates to be cast into the core walls complete with attached reinforcing bar couplers. The roof was then erected and site welded to the cast-in plates.

We also supplied and erected 14no communal garden support beam the largest being 21 metres long and 1.6 metres deep. These beams span between the concrete ring beams over the underground carpark.

Contract Type – Steel roof frames on concrete structures

Contract Value - £700,000

Approximate Contract Weight – 300tns

19th February 2020

Diana Hacker Mla Research Paper Service

Diana Hacker Mla Research Paper Service

So, you need to have to examine out the essays that match your excellent and conventional...

9th February 2020

App Store Optimization Tips Checklist Aso Guide For Ios Google Play Apps

App Store Optimization Tips  Checklist  Aso Guide For Ios  Google Play Apps

10 Of The Ideal No Cost Android News Apps

Whilst the above suggestions...

6th February 2020

Write My Paper For Me - Get A High-Top Quality School Paper WriteMyPaper.guru

Write My Paper For Me - Get A High-Top Quality School Paper WriteMyPaper.guru

Write My Paper For Me offers only high quality educational writing, customized...