One Tower Bridge, London, SE1

Steel roof frames, to 9no new concrete accommodation blocks.

The roof frame steelwork was supplied and erected onto new concrete structures. This was a very prestigious project, built between Tower Bridge and City Hall, with direct views across the Thames to The Tower of London. Prior to the steel frames being erected we supplied plates to be cast into the core walls complete with attached reinforcing bar couplers. The roof was then erected and site welded to the cast-in plates.

We also supplied and erected 14no communal garden support beam the largest being 21 metres long and 1.6 metres deep. These beams span between the concrete ring beams over the underground carpark.

Contract Type – Steel roof frames on concrete structures

Contract Value - £700,000

Approximate Contract Weight – 300tns