New East Ticket Hall, Farringdon Station, London, EC1A 9JQ

Temporary support steel to enable the construction of a new Crossrail station and ticket hall.

There are 2no levels of support steelwork supplied and erected. The steelwork is erected in 3no main phases, several large props were required, these were 1727mm diameter and 27 metres long.

The temporary loading gantry was also supplied and erected to enable the main contractor to delivery and collection materials, plant, etc.
We also supplied strengthening steelwork to the brickwork piers beneath Lindsey Street Bridge.

Contract Type – Temporary Props, Walers, Gantry and Support Steel

Contract Value - £700,000

Approximate Contract Weight – 470tns