New East Ticket Hall, Farringdon Station, London, EC1A 9JQ

Temporary support steel to enable the construction of a new Crossrail station and ticket hall.

There are 2no levels of support steelwork supplied and erected. The steelwork is erected in 3no main phases, several large props were required, these were 1727mm diameter and 27 metres long.

The temporary loading gantry was also supplied and erected to enable the main contractor to delivery and collection materials, plant, etc.
We also supplied strengthening steelwork to the brickwork piers beneath Lindsey Street Bridge.

Contract Type – Temporary Props, Walers, Gantry and Support Steel

Contract Value - £700,000

Approximate Contract Weight – 470tns

6th May 2019

How Long Does a person have to do To Write Some form of Novel?

How Long Does a person have to do To Write Some form of Novel?
How Long Does a person have to do To Write Some form of Novel?

When i started...

25th April 2019

7 Steps in Writing a study Paper: Savor Your Scholar student Life

7 Steps in Writing a study Paper: Savor Your Scholar student Life
7 Steps in Writing a study Paper: Savor Your Scholar student Life

Are you presently...

22nd April 2019

50 Trending Research Newspaper Topics to about for a Research Printer paper

50 Trending Research Newspaper Topics to about for a Research Printer paper
50 Trending Research Newspaper Topics to about for a Research Printer paper

...