Craven Hill Gardens, London, W2

A steel frame built within retained existing façade and walls.

There were 6no levels of floor steelwork supplied and erected while the existing roof was retained. The roof was then removed and a steel mansard roof frame incorporating an additional floor was then erected in its place. The steel beams, columns, etc, where delivered on hi-ab lorries off-loaded onto a loading gantry at 1st floor level and then raised or lowered to the relevant floor levels.

Contract Type - Steel frame within retained facades

Contract Value - £500,000

Approximate Contract Weight – 200tns

2nd October 2019

3 Techniques for Fire Up Reluctant Writers

3 Techniques for Fire Up Reluctant Writers
3 Techniques for Fire Up Reluctant Writers

Haven’t we all listened to similar...

6th September 2019

Why Restorative healing Practices Benefit All Students

Why Restorative healing Practices Benefit All Students
Why Restorative healing Practices Benefit All Students

Did you know that may...

6th September 2019

5 Suggestions for Avoiding Instructor Burnout

5 Suggestions for Avoiding Instructor Burnout
5 Suggestions for Avoiding Instructor Burnout

I had read a lot of articles around...