Craven Hill Gardens, London, W2

A steel frame built within retained existing façade and walls.

There were 6no levels of floor steelwork supplied and erected while the existing roof was retained. The roof was then removed and a steel mansard roof frame incorporating an additional floor was then erected in its place. The steel beams, columns, etc, where delivered on hi-ab lorries off-loaded onto a loading gantry at 1st floor level and then raised or lowered to the relevant floor levels.

Contract Type - Steel frame within retained facades

Contract Value - £500,000

Approximate Contract Weight – 200tns

10th July 2019

Marketing Administration Essay Case in point

Marketing Administration Essay Case in point
Marketing Administration Essay Case in point The document "Marketing Management"...

21st June 2019

No Man Is An Area

No Man Is An Area
No Man Is An Area

Any person as a child relies on his mom and dad, as a college...

21st June 2019

PEACE.

PEACE.
PEACE.

Peace is known as a word which can be comprehended by many in several...