Craven Hill Gardens, London, W2

A steel frame built within retained existing façade and walls.

There were 6no levels of floor steelwork supplied and erected while the existing roof was retained. The roof was then removed and a steel mansard roof frame incorporating an additional floor was then erected in its place. The steel beams, columns, etc, where delivered on hi-ab lorries off-loaded onto a loading gantry at 1st floor level and then raised or lowered to the relevant floor levels.

Contract Type - Steel frame within retained facades

Contract Value - £500,000

Approximate Contract Weight – 200tns

19th February 2020

Diana Hacker Mla Research Paper Service

Diana Hacker Mla Research Paper Service

So, you need to have to examine out the essays that match your excellent and conventional...

9th February 2020

App Store Optimization Tips Checklist Aso Guide For Ios Google Play Apps

App Store Optimization Tips  Checklist  Aso Guide For Ios  Google Play Apps

10 Of The Ideal No Cost Android News Apps

Whilst the above suggestions...

6th February 2020

Write My Paper For Me - Get A High-Top Quality School Paper WriteMyPaper.guru

Write My Paper For Me - Get A High-Top Quality School Paper WriteMyPaper.guru

Write My Paper For Me offers only high quality educational writing, customized...