Craven Hill Gardens, London, W2

A steel frame built within retained existing façade and walls.

There were 6no levels of floor steelwork supplied and erected while the existing roof was retained. The roof was then removed and a steel mansard roof frame incorporating an additional floor was then erected in its place. The steel beams, columns, etc, where delivered on hi-ab lorries off-loaded onto a loading gantry at 1st floor level and then raised or lowered to the relevant floor levels.

Contract Type - Steel frame within retained facades

Contract Value - £500,000

Approximate Contract Weight – 200tns

6th May 2019

How Long Does a person have to do To Write Some form of Novel?

How Long Does a person have to do To Write Some form of Novel?
How Long Does a person have to do To Write Some form of Novel?

When i started...

25th April 2019

7 Steps in Writing a study Paper: Savor Your Scholar student Life

7 Steps in Writing a study Paper: Savor Your Scholar student Life
7 Steps in Writing a study Paper: Savor Your Scholar student Life

Are you presently...

22nd April 2019

50 Trending Research Newspaper Topics to about for a Research Printer paper

50 Trending Research Newspaper Topics to about for a Research Printer paper
50 Trending Research Newspaper Topics to about for a Research Printer paper

...